Case Study

Cell Culture Facility

Built on the 15th floor of a central London hospital this Grade D Cell Culture facility provided a challenge. Not only was it logistically a challenge, the design time was limited and the solution had to be flexible and able to accommodate a VHP fumigation cleaning regime.



  • Demountable Partition System
  • Laser Cut Apertures
  • Recessed Base and Head Track for Flexibility
  • A Dedicated AHU to Each Room
  • Independent Metal Pan Ceiling
  • New Essential and Non Essential Power
  • Fully Validated 