​The project comprised of the installation and setting to work of a Combined Heat and Power Plant at a large teaching hospital in the North West of England.



  • ​1800kw Engine
  • Waste Heat Boiler
  • Peak Load Saving of 50%
  • New HV Ring Main Installed
  • Off-site Prefabrication