Case Study No. 26

Case Study

Flexilab

​Construction of a new Flexilab within the 3rd floor of a fully occupied research facility. The services distribution comprised of over 100 pre-assembled modules which were built off site to improve programme, quality, safety and cost.



  • ​Pre Fabricated Service Modules
  • Large Fume Cupboard Installation
  • Project Value £3,000,000
  • Flexible Design
  • Textile Air Socks
  • Occupied Facility