Case Study No. 36

Case Study

High Hazard Tablet Facility

High Hazard Tablet Facility encompassing Granulation, Milling, Fluid Bed Drying and Compression Suites.  Despite carrying out major construction works within an operational facility, careful planning and close coordination with the user ensured minimal disruption to site operations.



  • Full Turnkey Delivery of £9,000,000 Project
  • Project Executed on a ‘Target Cost’ Basis
  • HVAC Services Designed to cGMP Grade C
  • Attention to Detail – High Hazard Containment
  • 3D Modelling to Coordinate Complex Services
  • Structural Reconfiguration to Accommodate Clients Equipment
  • Close Coordination with FM Team for Isolations and Break In’s