Boulting Environmental Services Logo - BES

Slide 2 Slide 3 Slide 4

Design Study No. 4

Case Study

High Hazard Tablet Facility

​Full design service for the remodelling of an existing building to form a new High Hazard Tablet Facility, comprising of Granulation, Milling, Fluid Bed Drying and Compression Suites.



  • ​High Hazard Containment Facility
  • Materials / Products / Waste Flows
  • cGMP Grade D Cleanrooms
  • Client Definition Drawing
  • Full 3D Modelling
  • WFI and Process Services
  • Integration of Process Equipment

Case Studies

Design Commissions

Cleanrooms

Laboratories

Building Services

Warehouse / Packing



e-Brochures