Design Study No. 16

Case Study

High Bay Warehouse

Working closely with our client’s automated warehouse specialist BES produced a design which enabled the integration of state of the art materials handling equipment alongside the building fit out to include, storage and moving equipment for 14,000 pallets and four rack servicing cranes within a 51,000 m3 clad rack structure all within a closely temperature controlled environment.



  • Principal Designer
  • Fully Integrated Design Solution
  • Innovative Prefabrication Techniques
  • Part L Compliance
  • Innovative Hypoxic System