Boulting Environmental Services Logo - BES

Slide 2 Slide 3 Slide 4

Design Study No. 10

Case Study

Operational Improvement Study

Following detailed surveys of existing systems and a rigorous design and commissioning review, we identified fundamental design improvements to resolve operational issues and reduce energy consumption considerably.



  • ​Detailed investigation and studies
  • Complex pressure regimes
  • Containment Level 2 and 3 Labs
  • cGMP Clean rooms Grade C and D
  • Energy consultation – heat recovery design
  • Detailed Project Schedule production

  • BMS controls philosophy established & specified

Case Studies

Design Commissions

Cleanrooms

Laboratories

Building Services

Warehouse / Packing



e-Brochures