​Following on from our successful concept study we carried out the detail design and installation of a Vapour Compression cooling system, providing 2.5MW of chilled water to a Pharmaceutical Production Building. 



  • ​Vapour Compression Chillers
  • 2.5 MW Cooling
  • Chilled Water Filtration System
  • Project Value £1,000,000
  • Off Site Fabrication