MEDIA CENTRE

HERE ARE OUR News & Articles



Manufacturing Facility Completion

Manufacturing Facility Completion

16/03/2016

BES have recently completed a full turnkey project for a leading provider of renal products and services. We carried out the design, construction, commissioning and validation of a new Grade B Cleanroom and the refurbishment of existing corridors and manufacturing suites used for the production of intravenous therapies.

Cleanroom Mock-up Success

Cleanroom Mock-up Success

16/02/2016

​On two recent BES projects facility Mock-ups have been used during the concept and detailed design to help the client better understand the facilities egronomics and finishes. The ergonomic one was constructed with door opening and vision panel locations and included full scale representations of the equipment to be installed within the facility, for example Class 2 cabinets, and freeze dryers.

AstraZeneca Macclesfield Sterile Production Facility

AstraZeneca Macclesfield Sterile Production Facility

05/02/2016

BES are carrying out the internal fit out of a new £120m sterile production facility in partnership with AstraZeneca. The three storey building houses state of the art production equipment and is finished to the most exacting standards. Our scope of work encompasses the Design, Installation and Commissioning of all Architectural, HVAC, Electrical and Process utilities, to produce a highly sophisticated facility which includes sterile accommodation together with associated Clean and Technical spaces.

Temporary Works Training

Temporary Works Training

05/01/2016

We identify, design and manage all Temporary Works as an integral part of our construction process in accordance with BS5975. All of our Site Supervisors and Construction Managers have undergone a rigorous training programme and have been independently certified to fulfill the role of Temporary Works Coordinators.

Notice: Use of undefined constant PAGE_ID_COOKIE_POLICY - assumed 'PAGE_ID_COOKIE_POLICY' in /var/www/vhosts/besltd.org/httpdocs/inc/gdpr.php on line 57